Completing a full bespoke home automation project for a 5,000 square foot home typically takes 8 to 12 weeks. Here’s a breakdown of the process:
Planning and Design (1-2 weeks): Initial consultations and system design.
Pre-wiring and Infrastructure Setup (2-3 weeks): Installing wiring for circuits and devices.
Installation of Equipment (2-3 weeks): Mounting hardware and installing systems.
Control System Setup and Programming (2-4 weeks): Centralised control setup and device integration.
Testing and Handover (1 week): Final testing and homeowner training.
Note that the timeline can vary based on project complexity, material availability, and client changes.